Data Center Engineering

Infrastructure Built for the AI Era

Elistaria designs, builds, and operates data centers for the hardest workloads in computing: high-density GPU clusters, AI training, and HPC. Operating since 2008. One partner from first sketch to daily operations, with full accountability.

2008
Operating our own infrastructure since
80 kW+
Per-rack densities we design for
N+1 · 2N
Redundancy matched to requirements
1
Accountable partner, design to operations

The Problem We Solve

8 kW80 kW

Per-rack draw, five years apart

AI Changed the Rules. Your Infrastructure Has to Keep Up.

A rack that drew 8 kW five years ago now draws 80 kW or more. Air cooling reaches its physical limit at these densities. Power distribution sized for traditional servers buckles under GPU load transients.

Most facilities were never designed for this. Ours are.

Elistaria builds data centers around the realities of modern compute: dense power, liquid cooling, rapid scaling, and strict uptime targets. Whether you are planning a greenfield facility or upgrading an existing site, we bring the engineering depth to get it right the first time. We have operated our own infrastructure since 2008, so we design as people who also have to run what they build.

What We Do

End-to-End Data Center Expertise

All services

Why Clients Choose Elistaria

Reliability You Can Measure

01

Engineered for uptime

We design to recognized Tier standards, with redundancy models (N+1, 2N, 2(N+1)) matched to your actual availability requirements and budget. Not oversold, not underbuilt.
02

Efficiency that shows up on your energy bill

We test every design decision against its lifetime operating cost. Cooling strategy, power topology, airflow: each one tuned to lower your PUE and your total cost of ownership.
03

Compliance without friction

Health and safety, fire codes, electrical standards, environmental regulations. We handle the full compliance picture, so audits become routine instead of risk.
04

One accountable partner

Design, build, commission, maintain. When one team owns the full lifecycle, nothing falls between contracts.
05

Operating experience since 2008

We started as an operator, not a consultancy. Eighteen years of running production infrastructure inform every recommendation we make.

Flagship — Service 04

Built for GPUs: AI, ML, and HPC

A modern GPU rack can draw 40 to 130+ kW. Training runs push hardware at full load for weeks. Designing for this environment is not traditional design with bigger numbers. It is a different discipline, and we have practiced it in our own facilities since GPU compute became commercially relevant.

Explore GPU & AI Infrastructure

40130+

kW per rack, designed for

“The sequencing matters more than most people expect.”

Distinct Service Area — 06

Workplace Safety: A Discipline, Not a Checkbox

A data center concentrates high-voltage electrical systems, pressurized cooling circuits, fire suppression agents, stored chemical energy in batteries, and around-the-clock human activity in one building. Managing that safely is professional work, and we treat it as its own service line with dedicated specialists.

Explore Safety Services

Next step

Let’s talk about your next facility.

Whether you are sizing your first GPU cluster or planning a multi-megawatt campus, the earliest conversations shape everything that follows. Start yours with engineers who have done this before.

Schedule a Technical Consultation